Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution - Khalid S. Al-gahtani - 图书 - LAP LAMBERT Academic Publishing - 9783843350709 - 2010年12月13日
如封面与标题不符,以标题为准

Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution

价格
元 489
不含税

远程仓调货

预计送达时间 年7月24日 - 年8月5日
接收 Khalid S. Al-gahtani 新作品发布的通知
添加至iMusic心愿单

Not rated yet

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.

介质类型 图书     Paperback Book   (平装胶订图书)
已发行 2010年12月13日
ISBN13 9783843350709
出版商 LAP LAMBERT Academic Publishing
页数 324
商品尺寸 226 × 18 × 150 mm   ·   476 g
语言 英语