分享给好友:
Faster Construction Projects with CPM Scheduling Murray Woolf Ed edition
Faster Construction Projects with CPM Scheduling
Murray Woolf
This book features exciting, innovative methods for creating and maintaining schedules that will save busy pros time and money. These methods work seamlessly within Critical Path Movement (CPM) – the standard construction project management process – to dramatically improve scheduling results.
456 pages, black & white illustrations
| 介质类型 | 图书 Hardcover Book (精装硬皮书) |
| 已发行 | 2007年5月16日 |
| ISBN13 | 9780071486606 |
| 出版商 | McGraw-Hill Education - Europe |
| 页数 | 456 |
| 商品尺寸 | 191 × 236 × 30 mm · 924 g |
| 语言 | 英语 |