Estimating Required Contingency Funds for Construction Projects Using Multple Linear Regression - Jason J Cook - 图书 - Biblioscholar - 9781288332021 - 2012年11月21日
如封面与标题不符,以标题为准

Estimating Required Contingency Funds for Construction Projects Using Multple Linear Regression


商品到货时接收邮件提醒
Do you have a profile? 登录
添加至iMusic心愿单

Publisher Marketing: Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund. This research seeks to identify significant factors that may influence, or serve as indicators of, potential cost overruns. The study uses data on 243 construction projects over a full range of project types and scopes gathered from an existing United States Air Force construction database. The author uses multiple linear regression to analyze the data and compares the proposed model to the common practice of assigning contingency funds. The multiple linear regression model provides better predictions of actual cost overruns experienced. Based on the performance metric used, the model sufficiently captures 44% of actual cost overruns versus current practices capturing only 20% The proposed model developed in this study only uses data that would be available prior to the award of a construction contract. This allows the model to serve as a planning tool throughout the concept and design phases. The model includes project characteristics, design performance metrics, and contract award process influences.

介质类型 图书     Paperback Book   (平装胶订图书)
已发行 2012年11月21日
ISBN13 9781288332021
出版商 Biblioscholar
页数 68
商品尺寸 189 × 246 × 4 mm   ·   140 g

Mere med samme udgiver